HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

…Selection and calculation of support methods for slender tower structures

2021-03-11View Original

Thread Content

There is now a tower with a DN800 diameter, without equipment flanges, and the cylinder length is approximately 40 meters. How should it be supported? It is placed in a frame and supported by ear mounts; the NBT 47065.5 rigid ring supports are used, but their allowable vertical load is only 170 KN, which is already exceeded by the weight of the equipment in use. Moreover, seismic forces and wind loads have not been taken into account. If skirt support is used with a skirt height of 7m, the wall thickness will be very thick, and it will also be difficult to determine the size of the anchor bolts required. Has anyone encountered a similar situation? How did you handle it? Seeking help from experts
Reply #22021-03-12
The conical skirt is placed on the ground, the frame is installed, and the top guiding device is fixed; this approach is cost-effective

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.