I. Pre-production preparation: Check whether the electrical equipment is functioning properly, whether the machine operates smoothly, and whether the discharge valve is closed. II. Production Operations 1. Loading: Press the swing button briefly to raise the feeding end slightly above the horizontal level, turn off the motor that drives the swing, open the cover of the feeding end, and add material. Keep the feeding amount within 50% of the barrel’s volume; after feeding is complete, cover the lid and tighten it. 2. Turn on the swinging motor and the rotating motor simultaneously, mix for 10–15 minutes, then stop. (Use a timer to control it by setting a time.) 3. Press the intermittent swinging button at the discharge point to bring the discharge valve to its lowest position, stop the swinging, place the hopper in place, and then press the button to open the disc valve and start discharging. Once discharging is complete, close the discharge disc valve. III. Cleaning procedure: When changing products, the equipment must be cleaned using tap water or hot water. Close the discharge disc valve, press the swing button to lower the feeding end, open the feeding cover, tighten the screw cap on the water outlet, add tap water amounting to 10-20% of the cylinder’s volume, close the cover and secure it. Start the swing motor and the rotation motor to clean for 10-15 minutes before stopping. Press the swing button to lower the feeding end again, then press the rotation button to raise the water outlet above the horizontal level. Remove the screw cap, connect the water discharge pipe, place a bucket nearby, and press the rotation button once more to lower the water outlet to its lowest position, allowing water to be discharged. After draining the water, use a clean mop to wipe away any remaining moisture on the inner walls of the tank. Allow it to air-dry for 6-8 hours, then screw on the lid covering the water outlet before resuming production. IV. Maintenance Procedures 1. The reducer must have its oil changed regularly: every six months at first, and then once a year. When changing the oil, the oil level should be kept at the middle of the sight glass. 2. The transmission components need to be inspected regularly and kept well-lubricated. 3. All fastening bolts must be regularly checked for looseness and tightened as necessary. 4. Conduct maintenance work in a civilized manner, pay attention to safety, avoid damaging any components, and keep proper records of equipment operation, maintenance activities, and repairs.
Reply #22021-11-19
Thank you for sharing:victory:

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.