On April 23, Shaanxi Yanchang China Coal Yulin Energy Chemical Co., Ltd. held a meeting to summarize and commend the efforts made in the installation work related to the project’s completion, as well as a mobilization meeting for carrying out further efforts in this regard. Focusing on the overall goal of completing the construction by the end of August and achieving successful trial operation of the entire system in October, the meeting aimed to further unify thoughts, pool efforts, and boost morale in order to tackle the challenges associated with the completion of the project. It sought to sustain a momentum of intense effort, committing all resources to ensure that the project is completed on schedule, thereby guaranteeing successful trial operation of the system. The meeting established that the overall goal for this campaign is as follows: For the auxiliary systems, Boiler No. 5 in the thermal power plant should be ready for ignition by June 1st ; Boiler No. 6 will be ready for ignition on June 30 ; The first steam turbine at the air separation unit met the conditions for startup on June 15 ; Other public and auxiliary facilities will be completed successively according to the milestones set out in CCCC’s campaign plan. Process unit: The methane conversion unit met the handover conditions on June 30 ; The DMTO unit will meet the commissioning conditions by June 30 ; The PP3 unit will meet the handover conditions on July 15 ; The methanol complex will meet the handover conditions on July 30 (the synthesis unit on August 30) ; The LDPE/EVA plant met the handover conditions on August 15.
In 2016, Yanchang China Coal Yulin Energy Chemical Co., Ltd. launched the completion project for the first phase of the comprehensive utilization of coal, oil, and gas resources in the Jingbian Energy and Chemical Park, building on the successful implementation of its first-phase project. The remediation project is located in the chemical industrial park of Yangqiaopan Town, Jingbian County, Shaanxi Province. With a total investment of 14.413 billion yuan, it will build production facilities that use coal, oil, and gas as raw materials to manufacture 1.8 million tons per year of methanol, 600,000 tons per year of MTO, 288,000 tons per year of LDPE/EVA (including 144,000 tons), and 400,000 tons per year of polypropylene. The project will also produce 89,300 tons of mixed C4 compounds and 30,900 tons of C5 products as by-products. Of this, 868.28 million yuan was invested in environmental protection, accounting for 6.2% of the total investment. The project is scheduled to be put into operation in the second half of 2020. Once operational, Yueneng Chemical’s polyolefin production capacity will reach 1.9 million tons per year, making it the largest polyolefin production project in Shaanxi Province at present.
Process unit: The methane conversion unit met the handover conditions on June 30; The DMTO unit will meet the commissioning conditions by June 30 ; The PP3 unit will meet the handover conditions on July 15 ; The methanol complex will meet the handover conditions on July 30 (the synthesis unit on August 30) ; The LDPE/EVA plant met the handover conditions on August 15. Hurry up so you can drive this winter.
The news says that testing will be completed in October, and the Yulin area is ready for driving in winter
If the car can’t be driven in winter, this delay will only last until next June.