HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Major Industrial Equipment in the Chemical Industry】526—The 100-meter-high, 1,150-ton shift gas absorption tower at Yueyang Baling Petrochemical was lifted into place in 2022

2022-09-07View Original

Thread Content

This post was last edited by Desert Fish on 2022-9-26 at 21:18. On September 5, 2022, the heaviest and largest piece of equipment in the Baling Petrochemical’s caprolactam industry chain relocation, upgrading, and transformation project – Purification Unit Tower 001 (the reformate absorption tower for the hydrogen-ammonia unit) – was successfully lifted into place using the \"single-crane lifting method\", with a 5,000-ton gantry crane serving as the main crane and an 800-ton crawler crane acting as the auxiliary crane to assist with the lifting process after the equipment had been fitted with its necessary components. This transformed gas absorption tower weighs approximately 1,150 tons, is 99.36 meters tall, and has a diameter of 4 meters.
Reply #22022-09-22
Caprolactam – once something that strangled China’s industry abroad; thanks to the chemical industry workers! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.