Thread Content
HaiChuan celebrates the 73rd anniversary of the motherland; witness the significant development in chemical processing equipment. Replies will be rewarded – discussions are welcome. ---------------------------------------------------------- On June 6, 2022, the largest piece of equipment in Sinopec Balin Petrochemical’s project for the relocation, upgrading, and transformation of its caprolactam production chain was lifted onto land: the purification unit converter absorption tower, with a total weight of 913 tons. The upper section of this absorption tower weighs 470 tons; the lower section weighs 410 tons. The equipment was manufactured in Suzhou by Zhanghua Machinery. Due to its large length, the manufacturer produced it in three sections. On May 3 of this year, it was transported via waterway along the Yangtze River to the Daorenji temporary heavy-load dock, and from there it was transported by land to the construction site for assembly on site. After three months of on-ground assembly and the corresponding testing experiments, on September 5, 2022, the first tower of this facility – Tower 001, a 100-meter-high tower weighing 1,000 tons – whose function is to absorb transformed gas in the hydrogen-ammonia processing unit, was completed
Impressive. Thank President Yu for not forgetting the development of the forum during National Day. Like.
【Major Industrial Equipment in the Chemical Engineering Sector】October 2022 Series Summary Post https://bbs.hcbbs.com/thread-3552977-1-1.html (Source: Haichuan Network – Chemical Industry Insights)
Haichuan welcomes you; you make it even better