Eket Front Banner Wind and Solar Hydrogen Production Integrated Green Ammonia Project – Electrolysis Water Hydrogen Production Station Project
Thread Content
Project Name: Eket Front Banner Integrated Wind and Solar Hydrogen Production for Green Ammonia Production Project – Hydrogen Production Station Phase ILaunch Date: July 3, 2026
Region: Inner Mongolia
Industry/Project Type: Power/Wind Energy/Wind Power; Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Chemical Raw Materials ; New infrastructure and new industries / New industries / Hydrogen energy project owner: Shenneng Beifang (Ejinao Banner) Energy Development Co., Ltd. Total investment amount: 1,326,480,000 yuan. Current progress: The project has been registered. Location of construction: The Energy and Chemical Industry Zone in Shanghaimiao Economic Development Zone, Ejinao Banner, Ordos City, Inner Mongolia Autonomous Region; it extends from the Great Wall Power Plant in the east, to Shangdong Avenue in the west, to Weiwu Road in the north, and to Shenneng’s first-phase electrolytic water hydrogen production station in the south. The project entails the construction of a hydrogen production facility capable of producing approximately 20,000 tons of green hydrogen per year. The hydrogen production system will use proton exchange membrane (PEM) electrolyzers as the main equipment for hydrogen generation; in addition, alkaline (ALK) electrolyzers and anion exchange membrane (AEM) electrolyzers will also be employed to take advantage of the strengths of various technical approaches and to accommodate the variability of power from renewable sources. Supporting facilities include gas-liquid separation units, hydrogen purification systems, pressure reduction stations, hydrogen storage facilities, water treatment systems (including pure water and circulating water systems), access roads, as well as fire protection and security measures. Once completed, the facility will operate in accordance with the safety standards applicable to the hydrogen production industry using renewable energy. Progress milestone: July 1, 2026 – The project registration was completed at the end of April. (Project registration) April 29, 2026 – 1.326 billion! Fusion Green Ammonia Project: Registration for Hydrogen Production Station via Water Electrolysis (Project Registration)