Thread Content
On April 6, Li Zhonghua, deputy general manager and chief engineer of Jilin Chemical Construction Company, visited Daqing Petrochemical Engineering Company to attend the EPC kick-off meeting for the polypropylene unit of Xinjiang Shanneng Chemical Co., Ltd.’s 800,000 tons per year coal-to-olefins project, where he discussed the progress of the project with relevant officials from Xinjiang Shanneng Chemical Co., Ltd. and Daqing Petrochemical Engineering Company. Yao Hongwei, manager of the Xinjiang project department, and Niu Guochun, manager of the ethylene plant project department at Jilin Petrochemical, attended the meeting as well. During the meeting, participants conducted in-depth discussions on key topics such as project coordination procedures, civil construction, equipment installation, and key aspects of commissioning, aligned the needs of all parties accurately, clarified responsibility assignments, and reached multiple consensuses. It is reported that the 800,000 tons per year coal-to-olefins project at Wucaiwan in Zhundong, operated by Xinjiang Shanneng Chemical Co., Ltd., is a key project within Shanneng Group’s \"coal chemical integration\" base in Zhundong, Xinjiang. The total investment in this project amounts to 20.858 billion yuan, with production expected to begin by the end of 2027. Among them, the 450,000 tons per year polypropylene plant is scheduled to begin operations in April 2026, with the goal of starting product production by February 2028. This project represents another deep collaboration between the company and Shanneng Group, following the Inner Mongolia Rongxin polypropylene project. This meeting further enhanced communication and coordination among all parties, strengthening the foundation for cooperation. It not only provided a solid guarantee for the smooth launch of the project but also opened up broader prospects for comprehensive cooperation between the company and Shanneng Group.
【Haichuan Equipment Guessing Game】What equipment is this being cleaned? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717350 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, Changqing Oilfield developed China’s first \"integrated automated welding system for oil and gas field pipelines\". https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717357 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3069–2026: The Space Exploration Drive and Baofeng in Inner Mongolia to Build China’s first cluster of electrolytic hydrogen production facilities installed outdoors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717373 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Failure to Use Appropriate Insulating Pads When Carbon Steel Supports and Brackets Are in Direct Contact with Stainless Steel Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717387 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, SHENGU Group successfully developed the world’s first reciprocating compressor with an ultra-high thrust of 2000 kN! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717432 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: HaiChuan Chemical Engineering Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3080–2026: China’s first comprehensive evaluation standard for smart factories – the \"General Guidelines for Evaluating Smart Factories\" (GB/T 46734—2025). **The standard has been officially implemented.** https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717616 (Source: HCHBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: HaiChuan Chemical Engineering Forum (HCBBS))