Thread Content
Celebrating the 73rd anniversary of our motherland: Looking at the ten-year progress in chemical processing equipment. Replies will be rewarded; discussions are welcome------------------------------------------- At 5 a.m. on September 11, 2019, thanks to the all-night efforts of the employees at Zhongte Logistics, the oxidation reactor for CNOOC Huizhou Petrochemical Project was safely delivered to the Yangzi Petrochemical Terminal in Nanjing, thus completing the road transport of this \"giant\" equipment. This is the first time that Zhongte Logistics has used two NICOLAS self-propelled platforms to transport petrochemical equipment; it is also another successful road transportation project for large petrochemical items, following the waterborne transportation of Dalian Hengli’s petrochemical equipment completed in August. The oxidation reactor produced by Nanjing Zhongsheng Group is 31 meters long, 8.6 meters in diameter, and weighs 320 tons; its size is beyond imagination. For this transportation, the equipment is loaded using two sets of 4 columns and 5 axles of hydraulic plates; after loading, the vehicle has a width of 8.6 meters and a height of 9.6 meters, and it occupies most of the road surface when moving on a four-lane road. To minimize the impact on urban traffic, shipments began after 22:00 on the evening of September 10, with local traffic police maintaining order and directing traffic along restricted routes. Along the way, obstacles such as high-altitude traffic signs, signal lights, cameras, and cables are dealt with as one walks. The train set moved slowly at a speed of 1 kilometer per hour, and arrived at the Yangzi Petrochemical Terminal after 7 hours. After being loaded onto a ship, this unit will be transported to the Zhenjiang ERIC Port, where it will be shipped by sea along with 3 other reactor units to the Huizhou LNG Terminal for delivery.