HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The concrete core structures of the four circulation tanks in Gansu Juhua’s high-performance silicon-fluorine new materials integrated project have all been completed

2025-12-31View Original

Thread Content

The main structure of the circulation tanks for the Gansu Juhua project has been completed. Recently, significant progress was made on the integrated project for high-performance silico-fluorine new materials in Gansu, which is being constructed by Huadong Company; the concrete structures of the four circulation tanks associated with the fluorochlorine, fluoropolymer, auxiliary systems, and caustic soda production units have all been completed, laying a solid foundation for the subsequent installation of equipment and the construction of process pipelines. The circulating water tank is a key facility for ensuring the continuous and stable operation of chemical plants, featuring a large structural scale, complex processes, and high requirements for construction precision. Since the start of trench excavation, the project team has faced multiple challenges, including the delivery of drawings, technical coordination, and the precise positioning of numerous embedded components. Aiming for \"zero deviation,\" the project team ensures construction accuracy through meticulous oversight of nearly a thousand embedded components and pre-drilled holes throughout the entire process. During the topping-out concrete pouring phase, all construction workers worked in shift rotations day and night to ensure the quality and schedule of the concrete pouring. The critical period of construction coincided with heavy snowfall and low temperatures in the Yumen area. The project team promptly activated its emergency response plan to ensure the openness of transportation routes and work areas, and strictly implemented the winter construction procedures by enhancing on-site inspections as well as the insulation and curing of concrete, thereby ensuring safety and quality control during construction in such low-temperature conditions. The Gansu Juhua project is the largest industrial project in terms of investment scale in Gansu Province. Huadong Company is primarily responsible for the construction and installation of the key facilities related to the fluorochlorine industry segment of this project, with a planned completion time of 540 days. Upon completion, the project will play a significant role in optimizing the regional industrial structure, facilitating the complementary use of resource advantages between Gansu and Zhejiang provinces, and promoting the upgrading of China’s silicon-fluorine new materials industry.
Reply #22025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-31
【HaiChuan Chemical Technology Documentation】Analysis of the Causes of Overtemperature in the Air Preheating Coils of a Shift Converter Process and Corresponding Countermeasures https://bbs.hcbbs.com/thread-5709677-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HCBBS Chemical Forum)
Reply #52025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30-megawatt-class pure hydrogen gas turbine put into operation from 2025 to 2940 https://bbs.hcbbs.com/thread-5709894-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contes furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #72025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-31
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #92025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2929 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-31
Why are pneumatic valves rather than electric valves commonly used for valves in chemical processing plants? https://bbs.hcbbs.com/thread-5709042-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.