Thread Content
! On January 13, the refined oil production project of Haichen Company was officially launched with the groundbreaking ceremony held in the Lisha Island Fine Chemicals Park in Shatian Town. Upon completion, the project is expected to have an annual production capacity of 1.05 million tons. Once in operation, it will play a key role in promoting the upgrading of the Sha Tian industry and the optimization of its energy structure, thereby injecting new momentum into the regional economic development. The refined oil blending and production project, invested in and built by Dongguan Haichen Petrochemical Co., Ltd., is one of the first industrial projects to be launched in Shatian Town this year. With scientific project planning and comprehensive facilities, it will develop core functional areas including tank storage zones, loading/unloading areas, and administrative offices. It will also be equipped with advanced auxiliary environmental protection systems such as oil and gas recovery facilities and nitrogen supply systems, aiming to create a modern petrochemical production facility that is safe, environmentally friendly, and efficient. Upon completion and reaching full capacity, it is expected to achieve an annual production volume of 1.05 million tons, thereby injecting strong new momentum into the high-quality economic development of Shatian Town. It will also play a positive role in further optimizing the city’s petrochemical industry structure and enhancing the stability of the energy supply chain.
【Ten Years of Rapid Development in Chemical Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Release Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/thread-5711046-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first pressure relief device for flow meters in sulfur-containing gas fields in China was put into use from 2027 to 2026. https://bbs.hcbbs.com/thread-5711107-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first 1,500-meter-class vertical pipeline underwater connector with metal sealing has been certified: 2972-2026 https://bbs.hcbbs.com/thread-5711122-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Sea New Materials. https://bbs.hcbbs.com/thread-5711129-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Sinopec’s POE plants will use 100% domestically produced DCS systems by 2026; such systems have already been put into use at the Tianjin Nangang ethylene project. https://bbs.hcbbs.com/thread-5711441-1-1.html (Source: HaiChuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))