[Ten years of development of chemical equipment] 2068-2024 Like! Modular installation of 7 cracking furnaces for Tarim 1.2 million tons/year second phase ethylene

2024-12-11View Original

Thread Content

This post was last edited by The Swimming Fish in the Desert on 2024-12-12 22:28 to give a thumbs up to the achievements of China's chemical technology and equipment. Your participation in the discussion is the greatest encouragement. * * * * * * * * * * * * * * * * * * * * * * [Ten years of development of chemical equipment] Continue to update summary posts, welcome to participate in the discussion https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Forum Network) * * * * * * * * * * * * * * * * * On October 27, 2024, with the radiant chamber B of the 7# cracking furnace being hoisted in place, all seven cracking furnace radiant chambers of the ethylene unit of the Dushanzi Petrochemical Company's Tarim 1.2 million tons/year second phase ethylene project, undertaken by Huanqiu Sixth Construction Company, were hoisted. This marked that the cracking furnace of the ethylene unit of the Tarim 1.2 million tons/year second phase ethylene project entered the installation stage of convection modules, furnace tubes, etc. Tarim's 1.2 million tons/year second phase ethylene and supporting green low-carbon demonstration project is a concrete manifestation of important decisions and arrangements for promoting the supply-side structural reform and high-quality development of the petrochemical industry. Under the background of the "Belt and Road" construction, relying on unique location advantages, the advantages of "low cost, large scale, short process, and low investment" of ethylene downstream products are used to maximize the value of resource advantages. As the "leading" device of the entire site, the ethylene plant has a total of 7 cracking furnaces, including 2 gas furnaces and 5 liquid furnaces. Each cracking furnace is composed of 2 radiation chambers. The cracking furnace manufacturing adopts the construction mode of modular prefabrication and overall hoisting. dd shortens the manufacturing and installation cycle and leads the project with "six modernizations" practice. For this cracking furnace construction, the project department collaborated with the team of Huanqiu Beijing Company to give full play to the advantages of integration and consortium, anchoring the three major construction goals of "demonstration project, high-quality project, and benchmark project", and taking "factory prefabrication and modular installation" as the core The main line is to focus on party building closely around on-site construction and production, strengthen the embedded integration of party building, give full play to the leading role of party building, vigorously explore new ideas, new measures and new methods to promote "Party Building + On-site", combine the installation of cracking furnaces and large tower equipment hoisting, full-site management, and road construction to stimulate the endogenous force of party building. Party members and cadres give full play to the role of model leaders, rush to the front, work in the forefront, and practice it with practical actions * * members’ responsibilities and responsibilities. Comprehensively promote the "six modernizations", work hard on management innovation and work efficiency improvement, give full play to the advantages of "modular installation", innovate the construction process, and complete the welding of anchor nails and pull brick plates inside the furnace in one flat welding at the prefabrication site. The welding meat is full and smooth, and the welding is well formed in one go. The cycle is shortened by 2/3 compared with the previous welding method, ensuring high standards of construction quality and effectively reducing safety risks. At the same time, the prefabricated depth of factory column footings, stiffeners, and connecting beams is realized, and the error between the foundation axis spacing and the body column axis spacing is strictly controlled to achieve precise placement of the cracking furnace radiation chamber. At the same time, the company aims to "lead the way by example and strive for high-quality projects". Gan Shengjiang, the company's deputy general manager and chief engineer, provides on-site guidance and strictly follows the owner's on-site construction requirements and organizes implementation with high standards and high quality. Through continuous optimization of the construction organization plan, design, procurement and construction are "seamlessly connected", fully tapping the potential of internal resources, improving collaborative operations capabilities, realizing resource integration, greatly improving management efficiency, and striving to build the project into a green and low-carbon demonstration project. Before hoisting, the project department combined the successful experience of previous on-site hoisting, organized personnel to conduct risk inspections in the hoisting area, conducted safety technical briefings for on-site hoisting workers, crane drivers and other special operations personnel, and explained in detail various problems and solutions that may arise during the hoisting process. At the same time, the hoisting process and safety precautions were emphasized. The hoisting plan was continuously optimized, and the hoisting efficiency was accelerated. The successful completion of this hoisting operation is a concentrated demonstration of the sincere cooperation, scientific scheduling and superb construction technology of the project team. The radiation chamber is the "heart" of the cracking furnace. The success of this installation means an important step forward for the smooth construction of the project.
Reply #22024-12-12
Only half of the cracking furnace is modularized, accounting for about 25% of the workload.
Reply #32024-12-12
Looking at several recent projects, they are all in the radiant section module of the cracking furnace. This has reduced a lot of on-site work.
Reply #42024-12-12
[Ten years of development of chemical equipment] PetroChina’s first complete ethylene cracking furnace module weighing 3,200 tons from 2042 to 2024 was successfully put in place https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5674660 (Source: Haichuan Chemical Forum [Haichuan.com])
Reply #52024-12-12
[Ten years of development of chemical equipment] 2043-2024 Northern Huajin Ethylene Plant Cracking Furnace Radiation Section Integrated Module https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5674697 (Source: Haichuan Chemical Forum [Haichuan.com])

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.