20.8-billion-yuan integrated green aviation fuel demonstration project in Shuangyashan, Heilongjiang

2025-09-09View Original

Thread Content

Shuangyashan Green Aviation Fuel Integration Demonstration Project: This project is located in the Economic and Technological Development Zone of Shuangyashan City, Heilongjiang Province. It was invested and constructed by China Energy Engineering Group Heilongjiang Electric Power Design Institute Co., Ltd. and China Power Engineering Consulting Group Co., Ltd. The plan is to produce 300,000 tons of green aviation fuel and 200,000 tons of green methanol per year. The project is constructed in two phases. The first phase involves building a facility with an annual production capacity of 100,000 tons of green aviation fuel, which includes one green aviation fuel factory, a number of biomass preprocessing plants that utilize distributed wind power, centralized wind farms and solar power plants, a hydrogen production plant via water electrolysis, as well as various auxiliary production facilities. The project investment amount is 2,080,000 million yuan.
Reply #22025-09-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, self-developed 10-kilowatt oscillating water column wave energy generation device “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-09-09
【Frontiers of HaiChuan Chemical Technology】Amazing! The Dalian Institute of Chemical Physics has made significant progress in the field of photocatalytic hydrogen isomerization, achieving hydrogen isomerization at room temperature. https://bbs.hcbbs.com/thread-5700909-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-10
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first fully domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2661 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-09-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs have been achieved in the pre-oxidation technology for the carbon fiber industry between 2026 and 2025; China’s first pilot-scale pre-oxidation furnace utilizing a combination of hot air and microwave technologies with a width of 0.4 meters has been developed. https://bbs.hcbbs.com/thread-5701002-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-13
【Ten Years of Rapid Development in Chemical Equipment】2655-2025: Sinochem Shengao Chemical in China launches the MIAK product, a key raw material for high-performance anti-aging agents, filling a gap in the domestic market. https://bbs.hcbbs.com/thread-5700673-1-1.html (Source: Haichuan Chemical Forum)
Reply #72025-09-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-15
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
Reply #92025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2679 to 2025: Development of the world’s first DN700 swirl vortex flowmeter, breaking the monopoly on high-end flowmeters. https://bbs.hcbbs.com/thread-5701235-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #102025-09-15
【Ten Years of Rapid Development in Chemical Equipment】From 2681 to 2025: China successfully installed 1.8 million tons per year of ethylene plant cracking gas compressors developed independently https://bbs.hcbbs.com/thread-5701251-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first offshore wind project with fully embedded rock foundations, 2682-2025, withstood the impact of a typhoon of level 17 without any damage https://bbs.hcbbs.com/thread-5701254-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.