[Chemical Equipment Powerful Equipment] 261-Yanshan Petrochemical’s own S-Zorb catalytic gasoline adsorption desulfurization device R-101 desulfurization reactor

2022-05-21View Original

Thread Content

Red May for chemical workers! Reply rewards! ---------------------------------------------- The past ten years have been an era of great development for China's chemical industry. The emergence of many new processes, new products, and new equipment has also led to a great development in my country's chemical equipment, which has also promoted the rapid development of the petrochemical industry. Here we have collected and sorted out some of the achievements and breakthroughs made by my country's equipment companies in the large-scale and localization of equipment. Welcome everyone to share, discuss, and exchange, cheer for Made in China, and cheer for chemical equipment! ================================= On June 30, 2013, employees from the Mechanical Equipment Installation Branch and the Mechanized Construction Company of Beijing Yanhua Jianan Company braved the hot and muggy weather. After a day of intense construction, they successfully completed the hoisting of the R-101 desulfurization reactor of Yanshan Petrochemical’s second set of 1.2 million tons/year S-Zorb catalytic gasoline adsorption desulfurization device. The unit has now entered the steel structure and equipment installation stage. After the unit is completed and put into operation, the quality of Yanshan Petrochemical's gasoline will reach the National 5 standard. The R-101 desulfurization platform reactor hoisted this time was processed and manufactured by Beijing Yanhua Jian'an Equipment Manufacturing Branch. The reactor has a maximum diameter of 3.6 meters, a height of 42 meters, and a weight of 148 tons. It is the tallest and heaviest key core equipment in the device. In order to ensure the successful completion of the reactor hoisting, professional and technical personnel from the project department of Beijing Yanhua Construction and Installation Company and the mechanized construction company carefully formulated a technical plan for reactor hoisting using the "lifting method" of double cranes based on the site environment and careful investigation and measurement. Based on the maximum ground pressure during hoisting by the crane, The foundation of the hoisting area was treated, and two large cranes were put into position for three consecutive days of overtime work. During the reactor hoisting implementation, the project department and branch leaders coordinated and organized on site. The front-line team members carefully organized the construction according to the hoisting technical plan, and successfully completed this large-scale hoisting work.
Reply #22022-05-22
In the past, many construction companies could make pressure vessels.
Reply #32022-05-22
Cheers for Made in China and cheers for chemical equipment!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.