Thread Content
Latest Progress on Sinopec Great Wall Energy Chemical’s 1 million tons/year Methanol Project 2025-08-05 17:53 · Project Overview Project Name: Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd.’s 1 million tons/year Methanol Project Date of First Reporting: November 28, 2024 Date of Update: August 5, 2025 Location: Guizhou Province Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Products/Chemical Raw Materials Project Owner: Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd. Total Investment: 4,977.84 million yuan Current Progress: Environmental impact assessment approved Location of Construction: Within the Zhijin New Energy Chemical Industry Base in Chadian Bu Yi Miao Yi Township, Zhijin County, Bijie City, Guizhou Province, 27 km away from Zhijin County town Construction Scope: Production of 1 million tons/year of methanol from coal (based on pure methanol); 3 gasification units with a capacity of 1,500 tons per day each, a purification unit with a capacity of 315,000 Nm3/h, a sulfur recovery unit with a capacity of 40,000 tons per year, a methanol production plant with a capacity of 1 million tons per year (including compression, synthesis, distillation, and hydrogen recovery), as well as an air separation unit with a capacity of 70,000 Nm3/h. Additionally, there are various supporting utility systems and auxiliary production facilities. Progress milestone: 2025-08-04. The preliminary procedures for the project have not yet been completed, and construction has not started yet. (EIA Approval) June 26, 2025: Public notice prior to submission of the environmental impact assessment for Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd.’s 1 million tons per year methanol project. (EIA Public Notice) November 27, 2024: Internal review meeting held for the feasibility study of Guizhou Energy Chemical’s 1 million tons per year methanol project. (Feasibility Study Submission)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Global debut of the fourth-generation “superfluidized inorganic solid electrolyte” technology from 2585 to 2025: https://bbs.hcbbs.com/thread-5698140-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2587 to 2025! Zhejiang University develops elastic aerogel: remains unmelting at 2000°C https://bbs.hcbbs.com/thread-5698159-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】Sinopec’s PAO liquid-phase hydrogenation process from 2025 to 2058 helps domestic lubricants reach new heights of quality https://bbs.hcbbs.com/thread-5698182-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2597–2025: Breaking the “material bottleneck” in the display industry chain; China’s first production line for optical-grade MS resin goes into operation https://bbs.hcbbs.com/thread-5698436-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan Teahouse】The noodles in Dazu, Chongqing are truly impressive and make one want to stay longer. https://bbs.hcbbs.com/thread-5698459-1-1.html (Source: Haichuan Chemical Industry Forum)