HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Environmental impact assessment for the air separation unit associated with the Jintong Phase II project of Chifeng Guanggang Gas Co., Ltd., with a total investment of 329.78 million yuan, has been initiated

2025-11-24View Original

Thread Content

On November 20, the Management Committee of Chifeng High-Tech Industrial Development Zone issued a public notice to initiate the review process for the environmental impact assessment document related to the air separation project as part of the Phase II project of Chifeng Guanggang Gas Co., Ltd. This project is a new industrial gas production facility, located in the Dongshan Industrial Park in Yuanbaoshan District, Chifeng City, Inner Mongolia. The total investment amount is 329.78 million yuan, and the site covers an area of approximately 39,907.36 square meters. Of this, the investment in environmental protection amounts to 500,000 yuan, accounting for 0.15% of the total investment. The main construction content of the project is to build a new air separation unit with a capacity of 44,000 Nm³/h, including the main plant building and the outdoor equipment area. Once the project is put into operation, it will enable large-scale production of gas products. The main products include oxygen (44,000 Nm³/h) and nitrogen (61,200 Nm³/h), as well as various industrial and specialty gases such as liquid oxygen, liquid nitrogen, liquid argon, purified liquid oxygen, and krypton-xenon mixtures. The project simultaneously develops supporting facilities such as storage and transportation, auxiliary systems, public utilities, and environmental protection measures, to ensure that production operations and environmental protection progress in coordination.
Reply #22025-11-24
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-11-24
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-11-24
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52025-11-25
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-11-25
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72025-11-25
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-11-26
【Ten Years of Rapid Development in Chemical Processing Equipment】2848-2025: Zhanghua Machinery’s production of clean workshop facilities, TA2G titanium materials, and ammonia-containing condensate stripping towers – delivery completed. https://bbs.hcbbs.com/thread-5706081-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-11-26
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
Reply #102025-11-26
【Haichuan Chemical Accident Case】With multiple safeguards in place, why was it still unable to avoid \"human error\"? Fatal Flaws and Reflections on the “Pipe Opening Operation” Accident at a California Refinery https://bbs.hcbbs.com/thread-5706580-1-1.html (Source: HCBBS Chemical Forum)
Reply #112025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.