【Haichuan Overseas Engineering】Pouring of mass concrete for CCD equipment in the second phase of construction works for the mining and processing area of the KFM Phase II project in the DRC

2025-12-19View Original

Thread Content

On December 13 local time, the Sixth Branch of China National Chemical Engineering Corporation Sixth Construction Co., Ltd. successfully completed the pouring of the large-volume concrete for the CCD unit in the second phase of the construction work for the mining and processing area of the KFM Phase II project in the Democratic Republic of the Congo. The project is located in Kolwezi City, Lualaba Province, Democratic Republic of the Congo, and mainly includes works such as rough crushing, intermediate stockpiling, grinding, hard rock crushing, flotation, reagent preparation, concentrate thickening, tailings thickening, CCD, auxiliary power distribution rooms, as well as roads and other supporting facilities for the second phase of the project. Once the project is completed and put into operation, it will be able to process 6.6 million tons of copper-cobalt ore per year, producing 80,000 tons of copper and 40,000 tons of cobalt per year, which is of great significance for the local economic development. This concrete pouring project is large in scale and highly challenging, requiring the construction of 4 circular raft foundations, with a total pouring volume of 6,900 cubic meters. Faced with multiple challenges such as tight local raw material supply, limited concrete production capacity, and heavy rainfall during the rainy season, the project team established a comprehensive support mechanism covering technology, production, and transportation. Key team members remained on site throughout the process to ensure seamless coordination of all construction activities. The completion of this phase lays a solid foundation for accelerating the installation of subsequent core equipment.
Reply #22025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】2903-2025: Domestic sea water pumps for the Shanghai Apollo Jiangsu LNG receiving station passed operational tests https://bbs.hcbbs.com/thread-5708495-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #52025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt cavern compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-21
【Haichuan Black Technology】What’s it like to wear polyimide, a rocket insulation material? https://bbs.hcbbs.com/thread-5708925-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72025-12-21
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82025-12-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #92025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-23
【Ten Years of Rapid Development in Chemical Equipment】2891-2025: Filling Technical Gaps! ! ! Our country conducted the first full-scale test of leak-induced jet fire in high-pressure pure hydrogen pipelines. https://bbs.hcbbs.com/thread-5707712-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.