On February 19, the pneumatic jacking operation for the first storage tank at the Jiangsu Huadian Ganyu LNG Terminal – a key project aimed at improving the interconnection of natural gas infrastructure and the first LNG receiving station in the country to involve a state-owned power enterprise – was successfully completed. The project plans to build 3 LNG storage tanks with a capacity of 220,000 cubic meters each. After the project is put into operation, 4.2 billion cubic meters of natural gas will be exported each year. Photo provided by the interviewed unit. Lifting operations, also known as roof lifting, represent the most complex and difficult-to-control stage in the construction of LNG storage tanks. The principle is similar to blowing up a balloon: 4 high-power specialized fans generate a steady stream of air, which enables the nearly thousand-ton \"steel cap\" to be firmly placed on top of the storage tank, which is over 50 meters high, achieving millimeter-level precision in positioning.
【Haichuan Black Technology】What’s it like to wear polyimide, a rocket insulation material? https://bbs.hcbbs.com/thread-5708925-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production Permit https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2891-2025: Filling Technical Gaps! ! ! Our country conducted the first full-scale test of leak-induced jet fire in high-pressure pure hydrogen pipelines https://bbs.hcbbs.com/thread-5707712-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))