Recently, the key milestone of transitioning from civil construction to installation work for the asphalt and heavy oil storage facility at Maoming Port in Guangdong, undertaken by China National Nuclear Fifth Corporation, was successfully achieved. This marks the official shift in the project’s development phase from the main civil construction stage to the stage of tank welding and equipment installation. The pouring of the tank foundation is the basis for carrying out the installation and welding of the tank, and it also serves as an important barrier to prevent corrosion and leakage in the tank. The project team organized a professional team to conduct a 100% airtightness test on the installation of the anti-seepage membrane around the tank cluster, and monitored various technical parameters such as foundation load and settlement in real time. All relevant data met the **regulatory and design requirements, thus completing the pouring of the tank foundations successfully. The 4 new 5,000-cubic-meter storage tanks, pump houses, and loading skids constructed as part of the Guangdong Maoming Port asphalt and heavy oil storage facility serve as the key elements for storing and transferring asphalt and heavy oil, as well as for delivering them in precise quantities to end-users. Once completed, this facility will establish a transportation route for heavy oil and asphalt that connects the port, storage areas, and end-users, thereby significantly enhancing the region’s capacity to supply chemical raw materials. It will also improve the industrial layout in the western part of the Guangdong-Hong Kong-Macao Greater Bay Area, contributing to the high-quality development of the local economy.
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haichuan Chemical Industry Forum (HCBBS))
Thermisostatic pressing: One of the most advanced heat treatment and shaping technologies in the world. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717580 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】【3D Process Flow】Summary Post--Petroleum Refining Process Flow Diagram 16--Molecular Sieve Adsorption Purification Process Diagram https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717601 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Hchbbs Chemical Forum)
【3D Process Flow】Summary Post – Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilevered fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Forum (HCBBS))