2015-06-13View Original

Thread Content

May I ask what will happen if the ball passing test for the heat exchange tubes fails? Since there is steam inside the pipe, there is no risk of blockage. Please give me some guidance. Thank you
Reply #22015-06-13
I don’t understand. I’m more interested in how the ball-passing experiment is carried out If it can’t handle it, the heat exchange efficiency will be affected, right? If it cannot be achieved, the product cannot leave the factory, or it must be used with reduced parameters.
Reply #32015-06-13
Ball passing is done to ensure flow capacity; therefore, if it fails the standard, rework is required.
Reply #42015-06-13
It is still necessary to follow the standards; if it does not meet them, it needs to be revised...
Reply #52015-06-13
I would like to ask what the standards are for the ball-passing test on these heat exchange tubes. Thank you.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.