Pressure test

2015-07-14View Original

Thread Content

May I ask if the test manifold is mandatory in pressure tests? Which standard specifies such requirements? Where should the safety valve, which is used to control overpressure in the absence of a buffer tank, be installed? ? ? ? Thank you so much.
Reply #22015-07-14
This is required for equipment pressure testing; such a requirement is rarely imposed for pipeline pressure testing
Reply #32015-07-14
Pipe pressure testing exists as well, but I’ve never seen any standards for it. In the projects I work on, there are requirements specified in the specifications from Hyundai of South Korea. Under normal circumstances, safety valves should be installed at the highest point of the system being tested ; If it is placed at a low point, the pressure generated by the hydrostatic head must be taken into account.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.