Design scope of the main design institute and the air separation plant manufacturer

2015-07-16View Original

Thread Content

Now, all coal chemical projects have a main design institute. What exactly are the scope and content of the design work carried out by this main design institute during the preliminary design phase? What are the scope of design and design details covered by the air separation plant manufacturer selected through bidding? How do they divide the work?
Reply #22015-07-16
Basically, it’s the air separation plant manufacturer that is responsible for the cryogenic tank, right?
Reply #32015-07-17
Buildings such as factories belong to the civil engineering team of the Chemical Construction Company
Reply #42015-07-17
Our cold boxes are not the responsibility of the manufacturer; rather, it is the chemical construction company that is responsible for them. However, in most cases, the installation of the cold boxes is still carried out by the manufacturer
Reply #52015-07-17
The boundary range defined at the start of the design, or the flanges of the equipment serve as the boundary for division (the stress analysis should be carried out by the equipment manufacturer).
Reply #62015-07-17
The boundary range defined at the start of the design, or the flanges of the equipment serve as the boundary for division (the stress analysis should be carried out by the equipment manufacturer).
Reply #72015-07-17
In large-scale air separation plants similar to those used in coal chemical industries, the work is organized in this way: the owner first seeks a manufacturer who can provide the process packages for air separation. Typically, such process packages include all the equipment needed for air separation within the contract, but only the supply of the equipment is covered; installation is not included. The owner then hires an EPC contractor, who is responsible for the overall design, as well as for the utility systems, equipment installation, and civil engineering work related to the air separation plant
Reply #82015-07-17
These days, it is the air separation manufacturers who handle the entire design process for air separation. Compared to the cost of the equipment, the design fee is quite low; if you purchase their equipment, the design fee can even be waived
Reply #92015-07-17
The air separation plant manufacturers provide the process packages and cryogenic tank equipment, while the rest is handled by design institutes; the preliminary work can be carried out by the overall design institute, and the detailed design may also be entrusted to other design institutes. The factory building was definitely not built by an air separation plant manufacturer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.