Thread Content
Participation reward: 3 Wealth. Reward for correct answer: 10 wealth. When arranging double layers of rebar in the structural plan, the hooks of the lower layer of rebar ( ). A. Down or left B. Up or left C. Up or right D. Down or right New activities have started in the production area; the prizes are great, so hurry and participate: 【Production in Summer】The production area has entered the \"train during the hot summer days\" mode
B. Up or left. . . . . . . . . . . . . . . . . . . .
Hook of the bottom reinforcement (C. upward or to the right).
When arranging double layers of rebar in the structural plan, the hooks of the lower layer of rebar ( ). B. Up or left
When arranging double layers of rebar in the structural plan, the hooks of the lower layer of rebar (B). A. Down or left B. Up or left C. Up or right D. Down or right
When arranging double layers of rebar in the structural plan, the hooks of the lower layer of rebar should point upward or to the left (B).
B. Up or left :victory::victory::victory:
When arranging double layers of reinforcement in the structural plan, the hook length (D) of the lower layer of reinforcement. A. Down or left B. Up or left C. Up or right D. Down or right
B, upward or to the left------------------
When arranging double layers of reinforcement in the structural plan, the hook length (D) of the lower layer of reinforcement. A. Down or left B. Up or left C. Up or right D. Down or right. The representation methods differ in these two directions; in fact, the hooks of the upper reinforcement bars always point downward. On horizontal drawings, the upper reinforcement bars are indicated as pointing downward. In the vertical direction, the hooks of the upper layer of bars point to the right, while those of the lower layer point to the left