HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The origin of the regulation on the maximum hole diameter without additional drilling

2015-08-20View Original

Thread Content

Regarding the provision in 150 that openings do not require reinforcement, on what conditions is this based? When reinforcing thick-walled pipes, not all conditions are fully met as specified in 6.1.3; however, SW6 indicates that the requirements of 6.1.3 are satisfied, and no reinforcement is necessary. Are there any experience-based guidelines for reinforcing these small thick-walled pipes?
Reply #22015-08-20
This is related to the stress concentration factor; when the opening is very small, the stress concentration factor is low.
Reply #32015-08-20
Thank you, it was useful help. . . . . . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.