Water supply has been stopped for 3 months; now it needs to be resumed. What should be done?

2015-08-27View Original

Thread Content

The system has been stopped from receiving water for 3 months, but a small amount of wastewater containing ammonia nitrogen enters daily due to valve leaks. It has been found to have very weak nitrification capacity, but no denitrification capacity, as aeration was continued during the water shutdown period. Currently, TN is 130 mg/L and TP is 4.5 mg/L; the target levels are TN 50 mg/L and TP 3 mg/L. What measures should be taken to restore normal water inflow?
Reply #22015-08-27
The water inflow rate should be increased gradually from low to high; if the inflow is too high, it will result in an excessive shock load that can cause system failures.
Reply #32015-09-10
Roots blower sales and repair: 18954110001, WWW.LCFJWX.COM

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.