HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Request for LNG and pump skid floor plan drawings

2015-08-28View Original

Thread Content

This post was last edited by FORREST_GUMP on 2015-8-28 at 17:56. For LNG storage tank CAD drawings, it’s best to include pump skids as well. I’m now working on the LNG piping diagrams and have found that there is no information available regarding the equipment; I’m seeking help from fellow users. . . It would be best if there were equipment manufacturers; the equipment for this station, as it is currently designed, has not yet been determined
Reply #22015-08-28
Was my post posted in the wrong place? ? There was no echo. . .
Reply #32015-08-29
If your client hasn’t decided on the equipment, what pipes should you supply?
Reply #42015-08-31
Can’t there be piping without equipment for LNG? I’m using the existing equipment for now; once he decides on a new device, I can just replace it
Reply #52015-09-07
Why must LNG refueling stations use pump skids? Isn’t it more convenient to install it right now?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.