This post was last edited by hesonchang214 on 2016-10-28 07:53. Reward for participation: 2 Wealth. Reward for correct answer: 9 Wealth. As a system, construction projects have very distinct characteristics, including ( ). A. The tasks of a construction project are often carried out by multiple, sometimes even many, different units. Their relationship is usually not fixed, and the interests of some of these participating units may differ, or even be conflicting.
B. The responsibilities of a project manager are limited to overseeing project management; their main tasks involve controlling project objectives and coordinating activities.
C. In addition to organizational factors, human factors as well as methods and tools also play a role in determining whether a system’s objectives can be achieved.
D. All construction projects are one-time initiatives; there are no two projects that are exactly identical.
E. The life cycle of a construction project generally consists of the decision-making phase, the implementation phase, and the operation phase. The tasks and objectives at each phase vary, and the units involved also differ. This entire life cycle lasts for a long time.
Correct answers: ADE
A. The tasks of a construction project are often carried out by multiple, sometimes even numerous, units. Their relationship with one another is not always fixed, and the interests of some of these participating units may differ, or even be conflicting. D. Construction projects are one-time initiatives; there are no two projects that are exactly identical. E. The life cycle of a construction project generally consists of the decision-making phase, the implementation phase, and the operation phase. The tasks and objectives at each phase vary, as do the units that are involved in each phase. Its overall life cycle lasts for a considerable length of time
My answer: A C D E. . . . . . . . . . .
A. The tasks of a construction project are often carried out by multiple, sometimes even numerous, units. Their cooperative relationship is usually not fixed, and the interests of some of these participating units may differ, or even be opposed to each other. C. In addition to organizational factors, human factors as well as methods and tools also play a role in determining whether a system’s objectives can be achieved. D. Construction projects are all one-time initiatives; there are no two projects that are exactly identical. E. The life cycle of a construction project generally consists of the decision-making phase, the implementation phase, and the operation phase. The tasks and objectives at each phase vary, and the units involved in each phase also differ. The entire life cycle of such a project lasts for an extended period of time