Daily Question 2015.9.13 (EIA Discussion): 3 Wealth points for replies, plus 5 Wealth points for correct answers (single-choice question)

2015-09-13View Original

Thread Content

For a petrochemical project undergoing a first-level assessment of the groundwater environment, monitoring wells were installed at a depth of 19.0 m; the groundwater level within these wells was 3.0 m below the wellhead. What is the correct location for groundwater sampling? ()   A. 4.0m and 15.0m below the wellhead B. 4.0m and 9.5m below the wellhead C. 5.0m and 15.0m below the wellhead D. 5.0m and 11.0m below the wellhead Correct answer: A. Explanation: For grade 1, two sampling points are designated; the first sampling point is located 1 meter below the water level, while the second is located at 3/4 of the total well depth.
Reply #22015-09-13
The answer is A: For the first grade rating, two sampling points are designated; the first sampling point is located 1 meter below the water level, and the second sampling point is at 3/4 of the well depth.
Reply #32015-09-13
The correct locations for groundwater sampling are (A. 4.0 m and 15.0 m below the wellhead).   
Reply #42015-09-13
For a petrochemical project undergoing a first-level assessment of the groundwater environment, monitoring wells were installed at a depth of 19.0 m; the groundwater level within these wells was 3.0 m below the wellhead. The correct location for groundwater sampling is (A).   A. 4.0m and 15.0m below the wellhead B. 4.0m and 9.5m below the wellhead C. 5.0m and 15.0m below the wellhead D. 5.0m and 11.0m below the wellhead
Reply #52015-09-13
A. At 4.0 m and 15.0 m below the wellhead
Reply #62015-09-13
For a petrochemical project undergoing a first-level assessment of the groundwater environment, monitoring wells were installed at a depth of 19.0 m; the groundwater level within these wells was 3.0 m below the wellhead. The correct location for groundwater sampling is (A).
Reply #72015-09-13
For a petrochemical project undergoing a first-level assessment of the groundwater environment, monitoring wells were installed at a depth of 19.0 m; the groundwater level within these wells was 3.0 m below the wellhead. The correct location for groundwater sampling is (A).   A. 4.0m and 15.0m below the wellhead B. 4.0m and 9.5m below the wellhead C. 5.0m and 15.0m below the wellhead D. 5.0m and 11.0m below the wellhead
Reply #82015-09-13
For option A, one is 1 meter below the water level, and the other is at three-quarters of that depth.
Reply #92015-09-13
Answer A: For the first grade rating, two sampling points are designated; the first sampling point is located 1 meter below the water level, while the second sampling point is at 3/4 of the well’s depth
Reply #102015-09-13
A,-------------------------------------------------

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.