Technical discussion: Can bolt holes be drilled in a concrete foundation that has already been poured?

2015-09-16View Original

Thread Content

This post was last edited by hesonchang214 on 2015-9-28 09:09. It involves large equipment with concrete foundations of considerable size; after the foundations were completed, it was discovered that two bolt holes were missing during the equipment inspection. Is it possible to drill more holes in the existing foundations? The size of the anchor bolts is M33; the distance from the anchor bolts to the edge of the foundation is only 350 mm, and the depth of the anchor bolt holes must be at least 600 mm. Since it’s close to the edge, there’s a lot of concern that the existing foundation might be damaged. The concrete foundation contains rebar, and there’s also a risk that rebar might be present in the area where drilling is to take place; it’s a tricky situation.
Reply #22015-09-16
In general, a design institute is hired for situations like this; after all, it is the design institute that designs based on the equipment, and drilling can be an option chosen in that process. . . . . . . . . But 600mm. . . . . . . . . . . . . . . . .
Reply #32015-09-17
Don’t point out faults~~ I was at the construction site these past two days; it needs to be taken care of before the equipment is installed
Reply #42015-09-17
Look for those who specialize in drilling holes in concrete; there’s no need to worry even if there are rebar or similar elements, as it causes almost no damage to the foundation
Reply #52015-09-17
How dare I; P This is leveraging one’s strengths. It’s alive again! I’m so envious; I’m still in pain
Reply #62015-09-17
There are devices that can create such holes without affecting the foundation
Reply #72015-09-17
There are specialized drilling devices that can drill two holes directly, with no impact on the foundation.
Reply #82015-09-23
This is acceptable; generally, there aren’t many rebar bars at the top, so it doesn’t matter much if 1 or 2 of them break
Reply #92015-10-17
A drilling machine will do. Or use existing bolts to transition to a steel structural base.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.