HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can pipeline hydrotesting and small container hydrotesting be carried out simultaneously?

2015-10-13View Original

Thread Content

bg9.png Dear experts, can the pipelines and small containers be connected in series to conduct a hydrostatic test simultaneously? The design pressure for the double-phase steel pipeline is 0.53 MPa, and the test pressure is 0.89 MPa ; Stainless steel small container ①: design pressure 1.65 MPa, test pressure 2.1 MPa ; The stainless steel small container ② has a design pressure of 1.5 MPA and a test pressure of 1.9 MPA. Are there any requirements regarding the pressure difference? Help! ! ! !
Reply #22015-10-13
Upon completion of the project, there are regulations regarding whether pipes and containers can be connected together for pressure testing; refer to 50235 and 50236, or the relevant provisions in 20801 – connection for pressure testing is allowed only if the conditions are met
Reply #32015-10-13
No. A hydrostatic test is different from a leak test. The pressure difference is so large – 0.89 MPa and 2.1 MPa; what a huge difference in pressure!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.