HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Under what circumstances is it necessary to have redundant input (output) cards for DCS and SIS?

2015-10-21View Original

Thread Content

As the title suggests, are input (output) card redundancies required for all points involved in interlocking and control?
Reply #22015-10-21
1. According to the specification requirements, control systems with a SIL rating prefer to be redundant; 2. Generally, follow the requirements set forth by the property owners ; 3. Examine the design institute’s understanding of the key control points of the project and its common practices ; 4. The SIS system prefers to have full redundancy, including card redundancy, CPU redundancy, and power supply redundancy ; It seems that DCS offers less card redundancy; for critical process control, CPU and power supply redundancy are implemented.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.