I have gathered some questions from this year’s first-level constructor exam, along with their answers. I’m sharing them here to increase everyone’s interest in participating. Instead of posting them all at once, I’ll present a few multiple-choice questions or one case study at a time, with the answers hidden. The answer will be visible after responding. Everyone is welcome to participate; the moderator will give rewards to those who give correct answers. ****************************************** 13. According to the \"Construction Project Contract (Model Text)\" (GF-2013-0201), when the contractor purchases materials and construction equipment, the contract specifies the range of price fluctuations allowed for major materials and construction equipment. A. 10% B. 5% C. 4% D. 3% 【Answer】B 【Expert Explanation】Refer to page 259 of the textbook. When the contractor purchases materials and construction equipment, the contract should specify the range or percentage of variation allowed for the prices of these materials and equipment. If no such specification is provided, and the unit price of the materials or equipment changes by more than 5%, the excess amount should be adjusted using either the price index method or the cost information differential adjustment method. 14. In accordance with the \"Code for Valuation of Construction Projects based on Bill of Quantities\" (GB50500-2013), if there is no applicable item or a similar item in the priced bill of quantities for the changed project, the unit price for such changed project shall be determined by the party that proposes it. A. Contractor B. Supervisor C. Client D. Designer 【Reference Answer】A
Question 13: B. 5% Question 14: A. Contractor
The answer is B, A.............................
13, B. ----14, A. ------------------------------------------------------------------------------
13. In accordance with the \"Construction Contract for Construction Projects (Model Text of Construction Contract for Construction Projects)\"(GF-2013-0201), when the contractor purchases materials and construction equipment, the contract stipulates that the range of price fluctuations for major materials and construction equipment is (B). A. 10% B. 5% C. 4% D. 3% 14. According to the \"Code for Valuation of Construction Projects with Bill of Quantities\" (GB50500-2013), when there is no applicable item in the priced bill of quantities nor any similar item for the changed project, the unit price for such changed project shall be proposed by (A). A. Contractor B. Supervisor C. Client D. Designer
13. In accordance with the \"Construction Contract for Engineering Projects (Model Text of Construction Contract for Engineering Projects)\"(GF-2013-0201), when the contractor purchases materials and engineering equipment, the contract specifies the range of price fluctuations for major materials and engineering equipment. B.5% 14. In accordance with the \"Code for Valuation of Construction Projects using Bill of Quantities\" (GB50500-2013), if there is no applicable item in the priced bill of quantities nor any similar item for the changed project, the unit price for such changed project shall be determined by the party that proposes it. A. Contractor
13. In accordance with the \"Construction Contract for Engineering Projects (Model Text of Construction Contract for Engineering Projects)\"(GF-2013-0201), when the contractor purchases materials and engineering equipment, the contract specifies the range of price fluctuations for major materials and engineering equipment. (B) A. 10% B. 5% C. 4% D. 3% When the contractor purchases materials and construction equipment, the contract should specify the range or percentage of price changes for the main materials and construction equipment ; In the absence of an agreement, and when the unit price of materials and construction equipment changes by more than 5%, the excess amount shall be adjusted for the cost of such materials and equipment using either the price index adjustment method or the cost information variance adjustment method. 14. According to \"Engineering Quantity List Pricing for Construction Projects\" (GB50500-2013), if there is no applicable item or anything similar in the priced engineering quantity list for the changed project, the unit price for such changed project shall be proposed by (A). A. Contractor B. Supervisor C. Client D. Designer
13. In accordance with the \"Construction Contract for Engineering Projects (Model Text of Construction Contract for Engineering Projects)\"(GF-2013-0201), when the contractor purchases materials and engineering equipment, the contract specifies the range of price fluctuations for major materials and engineering equipment. A. 10% B. 5% C. 4% D. 3% Answer: B. 14. According to the \"Code for Valuation of Construction Projects with Bill of Quantities\" (GB50500-2013), if there is no applicable item in the priced bill of quantities nor any similar item for the changed project, the unit price for that changed project shall be determined by the party that proposes the change. A. Contractor B. Supervisor C. Client D. Designer Answer A
According to the \"Construction Contract for Construction Projects (Model Text of Construction Contract for Construction Projects)\\" (GF-2013-0201), when the contractor purchases materials and construction equipment, the contract specifies the range of price fluctuations for major materials and construction equipment. B.5%