HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is the slope of a drainage ditch (open channel) determined?

2015-10-26View Original

Thread Content

How is the slope of a drainage ditch (open channel) determined?
Reply #22015-10-26
I should have the corresponding design specifications on hand; I can’t remember the name. I’ll check them when I go to work tomorrow.
Reply #32015-10-26
2.5% to 3% in terms of experience value is sufficient; this is the requirement in all the projects I’ve worked on. On-site supervision is necessary to ensure quality – without it, the overall slope might be acceptable, but local areas could still accumulate water. Mistakes are likely to occur during construction, so supervision is absolutely essential and must not be neglected

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.