【Daily Question】Question for Issue 20151028

2015-10-28View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? ( ) (A). Perform hydraulic balance adjustment on buildings and individual units to eliminate hydraulic imbalances. (B). Install room-temperature on/off control valves on the water supply pipes of each household. (C). The room temperature controller is installed in a room occupied by residents, at a location unaffected by sunlight and other heat sources. (D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling. 【Production and Management Division】Seeking moderators and technical discussants to join
Reply #22015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? ( D )
Reply #32015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? (B) (A). Perform hydraulic balance adjustment on the buildings and units to eliminate hydraulic imbalances. (B). Install room-temperature on/off control valves on the water supply pipes of each household. (C). The room temperature controller is installed in a room occupied by residents, at a location unaffected by sunlight and other heat sources. (D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling.
Reply #42015-10-28
D、---------------------------------------------
Reply #52015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? (D) (A). Perform hydraulic balance adjustment on the buildings and individual units to eliminate hydraulic imbalances. (B). Install room-temperature on/off control valves on the water supply pipes of each household. (C). The room temperature controller is installed in a room occupied by residents, at a location unaffected by sunlight and other heat sources. (D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling.
Reply #62015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? (D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling. )
Reply #72015-10-28
The answer is D........................................
Reply #82015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? (D) (A). Perform hydraulic balance adjustment on the buildings and individual units to eliminate hydraulic imbalances. (B). Install room-temperature on/off control valves on the water supply pipes of each household. (C). The room temperature controller is installed in a room occupied by residents, at a location unaffected by sunlight and other heat sources. (D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling.
Reply #92015-10-28
(D) For residents with requirements for room-specific temperature control, a high-resistance thermostatic control valve is installed on the radiator supply pipe in the main rooms of the dwelling
Reply #102015-10-28
The residential heating systems in a certain housing complex are all dual-pipe hot water heating systems with shared vertical pipes and individual radiators per unit; heat metering upgrades were carried out on these systems. To minimize disruption to residents, the time-on/area method was used for heat metering. Among the following technical modification measures, which one is incorrect? ( D )

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.