HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Corrosion replacement of blast furnace gas pipelines in the coke oven basement

2015-11-05View Original

Thread Content

The heating in our plant is of the regenerative type using coke oven gas; currently, blast furnace gas is being used for heating. Coke oven gas has not been utilized for a long time. Now, the blast furnace gas pipelines are corroding and leaking – what are the good ways to replace them?
Reply #22015-11-06
What material pipes were you using before? What is the operating temperature? Has anti-corrosion treatment been done on the pipeline? If so, what type of anti-corrosion treatment was used?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.