HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to put a jet pump into operation

2015-11-18View Original

Thread Content

Why is it necessary to supply steam to the ejector pump in a rehydration system before opening the steam extraction valve? A technician told me that opening the steam extraction valve first can affect the vacuum level. How exactly does it have an impact?
Reply #22015-11-24
Opening the extraction valve first will cause backflow
Reply #32015-11-25
During startup, the start-up vacuum pump is activated; during switching, the second vacuum pump is turned on first, followed by the first one, in order to remove the air and non-condensable gases from inside the jet pump

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.