HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking assistance with the process settings for the dilute ammonia tank

2015-12-03View Original

Thread Content

Atmospheric pressure storage tank for dilute ammonia solution, 80 cubic meters, with an ammonia concentration of 20%. I would like to ask the experts: is it necessary to install a nitrogen purge valve and a flame arrestor vent valve?
Reply #22015-12-03
It needs to be adjusted; otherwise, the flavor will be too strong and there could also be risks.
Reply #32015-12-04
20% ammonia solution will volatilize; in the absence of a recovery system, the gas phase at the top cannot be released directly. The ammonia storage tanks we built previously were connected to the gas phase of the absorption system. I’m not sure what the original poster plans to do regarding the gas phase

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.