Texaco gasification maintenance plan

2015-12-03View Original

Thread Content

Who has a Texaco gasification maintenance plan? After periodic shutdowns of the furnace, which pipes and equipment need to be inspected and cleaned? If anyone has such a plan, please let me know – I’d be extremely grateful! ! !
Reply #22015-12-04
Safety measures must be in place, and the replacement process must be qualified, etc. . . . . . . . . . . . . . . . . . . . . . .
Reply #32015-12-08
Once maintenance is carried out, everything such as the quench water filters, quench water pumps, syngas scrubber towers, gasifiers, lock hoppers, stamping water tanks, high-pressure ash water pumps, high-pressure flash tanks, oxygen pipelines, water-coal slurry pipelines, black water pipelines, and ash water pipelines needs to be maintained as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.