HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Everyone, work on these questions; there will be a reward for those who get them right. 114/2015 – First-Class Constructor Exam, \"Project Management\": Multiple-choice questions, 100 questions in total

2015-12-12View Original

Thread Content

Everyone, come and do the exercises; those who get them right will receive a reward. It’s the 114th installment of the 2015 First-Class Constructor Exam – multiple-choice questions on Project Management. Those who do these exercises every day are truly enthusiastic learners! ! Today marks the start of the project management series – welcome to join! *************************************************I’ve gathered some questions from this year’s First-Class Constructor exam, along with their answers. I’m sharing them here to boost everyone’s interest in participating. Instead of posting them all at once, I’ll present a few multiple-choice questions or one case study at a time, with the answers hidden. The answer will be visible after responding. Everyone is welcome to participate; those who give correct answers will receive rewards from the moderators. Registration area: [Everyone can take questions – correct answers earn rewards] – Compilation of 1st-level constructor exam questions 21015: http://bbs.hcbbs.com/thread-1506671-1-1.html ******************************************After completing the questions, it’s time to rest; enjoying delicious food is the best way to relax. Everyone is encouraged to visit the food-related posts in this section: Compilation of food-related posts. Feel free to share your own experiences as well. You’re also welcome to join discussions in the safety section and explore the interesting posts on violations of regulations. ******************************************100. According to the “Model Text for General Contracting of Construction Projects (Trial)” (GF-2001-0216), the main rights and obligations of the contractor include ( ) A. Repairing, at its own expense, any defects identified during post-completion testing, as stipulated in the contract. B. Submitting relevant reports in accordance with the contract terms and the employer’s requirements. C. Sending a written notice to the employer to suspend work, as required by the contract. D. Requiring compensation for losses caused by the employer, as specified in the contract. E. Handling the procedures for project approval, authorization, or registration, as well as obtaining the right to use the project site. Correct answer: ABCD
Reply #22015-12-12
A, B, C, D. ——–E is the owner’s concern
Reply #32015-12-12
According to the \"Model Text for General Contracting of Construction Projects (Trial)\" (GF-2001-0216), the main rights and obligations of the contractor are (A B C D)
Reply #42015-12-12
100. According to the \"Model Text for General Contracting of Construction Projects (Trial)\" (GF-2001-0216), the main rights and obligations of the contractor are (BCD). A. To repair, at its own expense, the defects identified during the tests after completion, as stipulated in the contract. B. To submit relevant reports in accordance with the contract provisions and the employer’s requirements. C. To issue a written notice to the employer to suspend work, as required by the contract. D. To claim compensation for losses caused by the employer’s actions, as specified in the contract. E. To handle the procedures for project approval, authorization, or registration, as well as to obtain the right to use the land for the project
Reply #52015-12-12
100. According to the \"Model Text for General Contracting of Construction Projects (Trial)\" (GF-2001-0216), the main rights and obligations of the contractor are (ABCD).
Reply #62015-12-12
According to the \"Model Text for General Contracting of Construction Projects (Trial)\" (GF-2001-0216), the main rights and obligations of the contractor are (ABCD). A. To repair, at its own expense, any defects identified during the tests conducted after completion, as stipulated in the contract. B. To submit relevant reports in accordance with the contract provisions and the requirements of the employer. C. To issue a written notice to the employer to suspend work, as required by the contract. D. To claim compensation for losses caused by the employer’s actions, as specified in the contract. E. To handle the procedures for project approval, authorization, or registration, in order to obtain the right to use the land for the project
Reply #72015-12-12
100. According to the \"Model Text for General Contracting of Construction Projects (Trial)\" (GF-2001-0216), the main rights and obligations of the contractor are (A, B, C, D)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.