HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Help needed: Oil supply to the AO tank in the refinery’s wastewater treatment plant is interrupted

2015-12-26View Original

Thread Content

The AOO process uses a sludge film activated sludge method; it was affected by a problem some time ago as a significant amount of oil entered the AO tank, and now it’s basically paralyzed. How can this be resolved? Newbie seeking help
Reply #22015-12-26
After aeration, oil generally floats on the surface of the water, and the floating oil is removed as quickly as possible by pumping it out.
Reply #32015-12-28
Aeration, oil removal; also, it’s necessary to have a thorough discussion regarding the discharge process:D

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.