This post was last edited by yuchenchf on 2016-1-20 at 11:27. What is the total cost of a 90t/h boiler equipped with a 90MW steam turbine? Including turnkey services, etc.
How should I reply to something so blunt? You have to mention what type of boiler and turbine it is What is the specific scope?
Circulating fluidized bed boiler, including all costs. (Apart from civil engineering)
Are the data correct? A 90-ton boiler is not compatible with a 90MW steam turbine.
It’s probably within 20 million, depending on what’s included. You can’t just have the boiler and turbine as the main equipment; many additional devices are also needed.
Asking such rudely must mean it’s some wealthy boss, not an engineering technician
Yes, there are also auxiliary boiler rooms, pump houses, water treatment facilities, substations, fuel systems, coal transport systems, equipment for desulfurization, denitrification, and dust removal, as well as steam pipeline networks and other associated facilities and buildings. An estimated cost of 30 to 40 million is required for a set of coal-fired boilers with a capacity of 90 tons per hour.
It should also be specified whether the package includes costs for installation and commissioning, technical service fees, electrical systems, instrumentation systems, etc. Is it really only about boilers and turbines that are in question?
““All”? It depends on your steam pressure and temperature rating What is the layout and length of the steam pipeline network? Power grid connection plan? Wait