Come up with something related to the three simultaneities; see if you know which three they are. Single-choice question: The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget. Such facilities should be designed simultaneously with the main structure of the project (A), constructed at the same time, and put into use once construction is complete. A design simultaneously, B plan simultaneously, C submit for approval simultaneously
The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and such facilities should be constructed simultaneously with the main structure (A), and brought into operation at the same time. A design simultaneously, B plan simultaneously, C submit for approval simultaneously
The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget. These facilities should be designed simultaneously with the main structure of the project, constructed at the same time, and put into use once the project is completed.
The key concept in this question is the \"three simultaneities\" for occupational disease prevention measures in construction projects: simultaneous design, simultaneous construction, and simultaneous commissioning for production and use.
A Design simultaneously~~~~~~~~~~~~~~~~~~~~~~~