Thread Content
This post was last edited by *nht1 on 2016-2-18 21:29. I am an honest person who abides by the law; Strong sense of responsibility and diligent hard work ; Diligent and sincere, eager to learn* ; Good at accumulating work experience and has strong interpersonal skills ; Possesses certain professional skills and on-site experience, is good at learning and conducting investigations, and actively offers suggestions ; Possesses a strong team spirit, as well as excellent judgment and logical analysis skills. Mr. Xin, 15213910251, *nht1@163.com – capable of preparing project proposals, feasibility reports, investment estimates, preliminary design plans, and project schedules; identifying the required process conditions, civil engineering requirements, equipment specifications, electrical requirements, and instrumentation controls; designing and drawing process flow diagrams, layout plans, and equipment diagrams; designing simple structures such as storage tanks, pipe racks, and platforms as well as their foundations; selecting and calculating chemical processing equipment; specifying anti-corrosion measures; choosing appropriate pipeline materials; and conducting technical communication and coordination with project contractors. Through engaging in production and operation, engineering construction, scientific research and development, as well as technical upgrades, I have accumulated considerable experience in production practice, engineering design, scientific research and development, 5S workplace management, safety management, and equipment management. Has strong written communication skills. Capable of performing civil service tasks such as writing and editing documents; proficient in using Office software and AutoCAD for drawing (having created numerous engineering drawings); able to carry out simple design and drafting work. Able to independently prepare various project plan reports, as well as process technical operation procedures, equipment operation and maintenance procedures, and safety operation procedures. Able to independently develop emergency response plans, and to prepare and establish project construction schedules. Able to handle related technical tasks. Job responsibilities: From 2010 to 2015, I was involved in the preliminary and construction designs for the company’s projects related to exhaust gas purification (such as exhaust gases containing sulfuric acid and hydrofluoric acid), the concentration and recovery of waste acid, as well as the recovery of fluorine resources. I was also responsible for providing process conditions and handling technical aspects related to these processes; the total investment for these projects was approximately 100 million to 150 million. Specifically responsible for preparing project proposals, feasibility reports, investment estimates, preliminary design plans, and project schedules. Also involved in defining the process conditions, civil engineering requirements, equipment specifications, electrical requirements, and instrumentation control parameters; designing and drawing process flow diagrams, layout plans, and equipment diagrams. In addition, responsible for the design of simple equipment such as storage tanks, pipe racks, and platforms as well as their foundations; selecting and calculating chemical processing equipment; specifying anti-corrosion measures; choosing pipeline materials, etc. Furthermore, engaged in technical communication and coordination with the contractors carrying out the project. I have participated in the commissioning of the above-mentioned projects on multiple occasions, prepared commissioning plans and operation instructions, worked in shift rotations during commissioning, drafted commissioning summaries and operating procedures (also known as work instructions), and was responsible for training the operators on these procedures. In 2013, I participated in a project to upgrade the roasting and combustion system, and co-authored one paper on the subject. In 2014, I was involved in the company’s project to recycle steam condensate, working on the preliminary technical assessments. I was responsible for communicating with the contractors, conducting on-site inspections, and providing the necessary process and technical specifications. In 2014, I participated in the company’s water balance testing, carried out on-site measurements and data collection, and prepared the water balance test report along with the related diagrams.