HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Process for adding new solvent to the system

2016-02-16View Original

Thread Content

Excuse me, where is the injection point for adding fresh solvent to the amine solution system? Should it be poured into the absorption tower, the regeneration tower, or some other location? Thank you!
Reply #22016-02-16
New solvent — solvent preparation tank — solvent storage tank, entering the system circulation.
Reply #32016-02-16
I’m sorry, it’s still the same issue: I can’t get the circulation in order. The new solvent is prepared and placed in the storage tank, and when needed, the pump is started to send it to the bottom of the regeneration tower

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.