This post was last edited by hesonchang214 on 2016-3-3 09:27. Reward for participation: 2 wealth points. Reward for correct answer: 9 wealth. A certain construction project consists of two individual projects, A and B, and the costs for these projects are shown in the table below. If the management fee for the project owner is 3 million yuan, then the amount of the project owner’s management fee that should be allocated to Project B is ( ) million yuan. Single project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan). A: 3500, 500, 2000 B: 1500, 300, 1200. Options: A.90.0 B.93.1 C.100.0 D.112.5. Correct answer: C.100.0
C;(3500+500+2000):(1500+300+1200)=2:1
A certain construction project consists of two individual projects, A and B, and the costs for these projects are shown in the table below. If the management fee for the project owner is 3 million yuan, then the amount of the project owner’s management fee that should be allocated to Project B is (C) million yuan. Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan). A: 3500, 500, 2000 B: 1500, 300, 1200. A. 90.0 B. 93.1 C. 100.0 D. 112.5
A certain construction project consists of two individual projects, A and B, and the costs for these projects are shown in the table below. If the management fee for the project owner is 3 million yuan, then the amount of the project owner’s management fee that should be allocated to Project B is (A) million yuan. Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan). A: 3500, 500, 2000 B: 1500, 300, 1200. A. 90.0 B. 93.1 C. 100.0 D. 112.5
A certain construction project consists of two individual projects, A and B, and the costs for these projects are shown in the table below. If the management fee for the project owner is 3 million yuan, then the amount of the project owner’s management fee that should be allocated to Project B is (C) million yuan. Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan). A: 3500, 500, 2000 B: 1500, 300, 1200. A. 90.0 B. 93.1 C. 100.0 D. 112.5