HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Representation methods for pipe supports

2016-02-29View Original

Thread Content

What do the guide supports TD42_300-150 and TD41-150 in the pipeline mean? And what do JA91-300-1100, ZJ6N-1800, and TZ21-150-200 mean?
Reply #22016-03-01
Go and check the support specification document for this project.
Reply #32016-04-10
The pipe support table provides detailed dimensions
Reply #42016-04-11
Each design institute has its own support diagram; the institute is required to provide it
Reply #52016-04-12
Find the designers; they have pipe rack catalogues with detailed explanations. Did the design team not provide any technical briefings?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.