HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Requirements regarding the qualifications of design institutes and designers for oil refining plant design

2016-03-04View Original

Thread Content

Seeking help: What specific requirements are there for design institutes and designers regarding delayed coking, hydrogenation, and hydrogen production facilities? Which **level document** does this regulation come from? Thank you, looking forward to a reply
Reply #22016-03-04
Refining units such as delayed coking, hydrogenation, and hydrogen production plants impose restrictions on design institutes in terms of \"qualification\" and \"design scale\", as specified in the \"Standards for Engineering Design Qualifications\" (2007 edition). For example: The design qualifications required are: Class A comprehensive qualification, qualifications specific to the petroleum, chemical, and pharmaceutical industries, as well as qualifications for oil refining projects, etc ; There are restrictions regarding scale, with grades A and B. Design institutes of Class A and Class B have restrictions on the number of staff they can employ.
Reply #32016-03-05
:victory: passing by

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.