【Joint Study*】【Electrical Version 20160305】

2016-03-05View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is ( ) or more, a temporary electrical construction plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW
Reply #22016-03-05
When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is (C) or more, a temporary electrical installation plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW
Reply #32016-03-05
When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is (C) or more, a temporary electrical installation plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW
Reply #42016-03-05
When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is (C) or more, a temporary electrical installation plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW
Reply #52016-03-05
When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is (C) or more, a temporary electrical installation plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW. When there are 5 or more temporary electrical devices at a construction site, or when the total capacity of these devices is 50kW or more, an electrical planning document must be prepared
Reply #62016-03-05
When there are 5 or more electrical equipment units at the construction site, or when the total capacity of such equipment is (C) or more, a temporary electrical installation plan must be prepared. A. 30KW; B. 40KW; C. 50KW; D. 60KW; E. 70KW

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.