HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Signing of the feasibility study report

2016-03-10View Original

Thread Content

How to sign a feasibility study report? Is it signed at three levels: setup, verification, and review? Is it necessary to get approval? Thank you!
Reply #22016-03-10
Personal opinions should be justified before approval
Reply #32016-03-10
In the institute, feasibility study reports are usually prepared by a few experienced experts from the preliminary design department or the process engineering department, after which the technical economics department carries out the calculations, ensuring both speed and accuracy. But look at the signing page: there is a person in charge of each specialty, as well as those responsible for verification and approval at the school level, with the chief engineer providing the final approval. This is a requirement of the technical management system of the design institute.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.