HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

May I ask, does the calculation of the weir plate height and dimensions in a three-phase separator fall under mechanical engineering calculations or process engineering calculations?

2016-03-16View Original

Thread Content

Three-phase separators are quite complex; as someone who has only been working in the field of machinery for less than two years, I really don’t know how to handle them. I can do strength calculations, but I’m not proficient in the internal process calculations. Yet my supervisor has asked me to carry out these calculations, and they need to be accurate. So, does this fall under the category of process calculations or mechanical calculations? The calculations I need to perform include determining the height of the weir plates, checking whether the settling time of oil, gas, and water meets the requirements related to the distance between the weir plates and the inlet, identifying the type of separation that will be used, and ensuring that the oil content in the water meets the minimum standards specified by the client.
Reply #22016-03-16
This should be the responsibility of the process design team.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.