HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

About Aspen

2016-04-02View Original

Thread Content

I was wondering if anyone could help answer this question. It would be great if the explanation could be simple – what is the difference between design calculations and verification calculations in Aspen?
Reply #22016-04-02
The design is a result automatically calculated by the software, such as the dimensions of the torch light network; Verification means you enter a dimension, and the software analyzes whether that dimension is appropriate.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.